Fuqing Fujian Nuclear Power Co., Ltd.
Updated:2016-09-26 Font:[ Large Medium Small ]

Fujian Fuqing Nuclear Power Co., Ltd. was founded in May 16, 2006, by the China nuclear power Limited by Share Ltd, Hua Dianfu new energy Limited by Share Ltd and Fujian investment and development Refco Group Ltd respectively to 51%, 39% and 10% equity holdings joint venture. According to the modern enterprise system standard operation, as the project owner, is responsible for the development, construction, commissioning and operation of Fuqing nuclear power project, the full implementation of nuclear safety responsibility.

Fuqing nuclear power project is located in the town of Fuqing City Sanshan Qianxue Cunqi tail mountain front, is an excellent coastal nuclear power plant, the planning and construction of 6 million kilowatt pressurized water reactor nuclear power group, a planning, staging continuous construction, construction general contracting mode of nuclear power engineering China National Nuclear Corporation first used the full meaning of the power plant, 6 units the estimated total investment of about 90 billion yuan. Fuqing nuclear power project unit 1-4 construction by using the two generation advanced nuclear power technology, and according to the "Fukushima nuclear accident" experience feedback the implementation of a number of technical improvements, 1-2 unit comprehensive localization rate of 75%; 3-4 unit equipment localization in accordance with national policy requirements, the equipment of not less than 80%; 5-6 unit using our own three generation nuclear power technology - "Hualong No.1", is a demonstration project of nuclear power technology in Hualong no.1. All 6 units after the completion of the total power generation reached 45 billion kwh, an annual output value of about 17 billion yuan, a huge economic and social benefits, is conducive to optimizing the energy structure in Fujian Province, to promote the development of energy diversification strategy, will also determine the national strategy to achieve a strong impetus in Western economy.

Unit 1 was officially started in August 20, 2014, November 21, 2008 for the first time, in November 22, 2014 with the commercial operation conditions. Unit 2 was officially started in September 17, 2009, is currently being carried out thermal test preparation, is in the peak of the installation and commissioning. Unit 3 on December 31, 2010 officially started, is currently the member, the turbine installation work in pile engineering, installed at the peak. Unit 4 in November 17, 2012 officially started construction, lifting the dome in June 24, 2014 completed, the current installation work has been fully carried out. Unit 5 is in accordance with the country's three generation nuclear power development strategy, and actively carry out the preparation of the site ready.

Nuclear safety is the lifeline, the company will always adhere to the "safety first, quality first" principle, vigorously promote the "four" spirit of the nuclear industry, nuclear industry, uphold the "open, inclusive, cooperative, win-win" business philosophy, adhere to the "high-quality, safe and clean nuclear power, promote energy conservation, ecological protection the environment, social services, benefit the people" of the enterprise purpose, high quality, high standard construction and operation of power plant, and make a greater contribution to the efficient development of the sustainable development of the local economy and social security of China's nuclear power industry.

(data by November 23, 2014)